Impact of Plants and Equipment Management in Construction Industry of Iran

Hamid Aadal, Ali Bagheri Fard, Kiyanoosh Golchin Rad, Pejman Ghasemi poor Sabet and S. Reza Morshedi. E
Department of Structure and Materials, Faculty of Civil Engineering, Universiti Teknologi Malaysia (UTM), Johor Bahru, Malaysia
Research Journal of Applied Sciences, Engineering and Technology  2014  11:2371-2375
http://dx.doi.org/10.19026/rjaset.7.538  |  © The Author(s) 2014
Received: August 12, 2013  |  Accepted: August 30, 2013  |  Published: March 20, 2014

Abstract

During the recent years different people in charge have been considered about different costs of the plants in the construction industry. Usually it seems to be a big challenge for different people in charge and mainly contractors to decrease the costs of the projects through the optimum use of construction plants in order to increase the quality of the project and decrease time and cost. During the current study, researchers have been investigated about the construction plant use in the construction sites and also its effect on the quality and also time of the project. Forty three people in charge with the construction projects have been participated in the current survey. After analyzing the required data through SPSS software and based on the mean index of the scores five items have been identified as the most important issues in the construction management regarding the use if plants namely: The effect of spare parts availability to decrease downtime, the effect of employing expert mechanics to increase the repair quality, impact of gasoline and petrol availability to decrease wasting the time, impact of periodic control and serviceability of plants and equipment to increase productivity, impact of training persons who are involved plants and equipment to increase productivity. It goes without saying that extracted factors have significant role in the construction projects and different contractors should consider them in their projects.

Keywords:

Construction plants and equipment management, construction project, productivity,


References

  1. Arditi, D., S. Kale and M. Tangkar, 1997. Innovation in construction equipment and its flow into the construction industry. J. Construct. Eng. Manage., 123(4): 371-378.
    CrossRef    
  2. Bagies, A. and C. Fortune, 2006. Bid/no-bid decision modeling for construction projects. Proceedings of 22nd Annual Conference the Association of Researchers in Construction Management, 1: 511-21.
  3. CITB, 2007. CPCS Scheme Booklet. Construction Plant Competence Scheme, The Construction Industry Training Board, May, Document ref: CPCS B2. (Accessed on: February 23, 2009).
    Direct Link
  4. Cooke, B. and P. Williams, 2004. Construction Planning, Programming and Control. 2nd Edn., Blackwell, Oxford.
  5. Day, A.D. and N.B. Benjamin, 1991. Wiley Series of Practical Construction Guide. Construction Equipment Guide, 2.
  6. Drucker, P.F., 1999. Practice of Management. Butterworth-Heinemann, Oxford.
  7. Dulaimi, M.F. and H.G. Shan, 2002. The factors influencing bidmark-up decisions of large-and medium-size contractors in Singapore. Constr. Manage. Econ., 20(7): 601-610.
    CrossRef    
  8. Edwards, D.J. and J. Nicholas, 2002. The state of health and safety in the UK construction industry with a focus on plant operators. Struct. Surv., 20(2): 78-87.
    CrossRef    
  9. Edwards, D.J. and G.D. Holt, 2009. Construction plant and equipment management research: Thematic review. J. Eng. Design Technol., 7(2): 186-206.
    CrossRef    
  10. Edwards, D., G.D. Holt and F.C. Harris, 1998a. Maintenance Management of Heavy Duty Construction Plant and Equipment. Chartridge Books, Oxford.
  11. Edwards, D. G.D. Holt and F.C. Harris, 1998b. Predictive maintenance techniques and their relevance to construction plant. J. Qual. Maint. Eng., 4(1): 25-37.
    CrossRef    
  12. Field, A., 2009. Discovering Statistics using SPSS. Sage, London.
  13. Garies, R., 1979. Business practices in the construction industry: A survey. J. Constr. Div., 105(4): 317-329.
  14. Gibb, A., S. Hide, R. Haslam, D. Gyi, T. Pavitt, S. Atkinson and R. Duff, 2005. Construction tools and equipment-their influence on accident causality. J. Eng. Design Technol., 3(1): 12-23.
    CrossRef    
  15. Harris, F.C., R. McCaffer and F. Edum-Fotwe, 2006. Modern Construction Management. 6th Edn., Blackwell, Oxford, pp: 305.
  16. Haslam, R.A., S.A. Hide, A.G. Gibb, D.E. Gyi, T. Pavitt, S. Atkinson and A.R. Duff, 2005. Contributing factors in construction accidents. Appl. Ergon., 36(4): 401-415.
    CrossRef    PMid:15892935    
  17. Health and Safety Executive, 2003. Causal Factors in Construction Accidents. The Health and Safety Executive, Research Report 156, HSE Books, London.
  18. Hinze, J. and W.B. Ashton, 1979. Current equipment practices of utility contractors. J. Construct. Div., 105(3): 225-237.
  19. Holt, A.S.J., 2005. Principles of Construction Safety. Blackwell, Oxford.
  20. Kline, R.B., 1998. Principles and Practice of Structural Equation Modelling. The Guilford Press, New York.
  21. Koivo, A.J., 1994. Kinematics of excavators (backhoes) for transferring surface material. J. Aerospace Eng., 7(1): 17-32.
    CrossRef    
  22. LeBlond, D., F. Owen, G.E. Gibson, C.T. Haas and A.E. Traver, 1998. Control improvement for advanced construction equipment. J. Construct. Eng. Manage., 124(4): 289-96.
    CrossRef    
  23. Majid, M.Z. Abd and R. McCaffer, 1997. Assessment of work performance of maintenance contractors in Saudi Arabia. J. Manage. Eng., 13(5): 91.
    CrossRef    
  24. Pilcher, R., 1992. Principles of Construction Management. 3rd Edn., McGraw-Hill, London.
    PMCid:PMC3103216    
  25. Rooks, B., 2005. Robotics outside the metals industries. Ind. Robot, 32(3): 205-8.
    CrossRef    
  26. Schexnayder, C.J. and D.E. Hancher, 1981. Contractor equipment-management practices. J. Constr. Div., 107(4): 619-626.
  27. Stewart, L.A.R.R.Y., 2002. Buyers juggle more rentals and leasing. Construct. Equip., 105(7): 44.
  28. Tavakoli, A., E.D. Taye and M. Erktin, 1989. Equipment policy of top 400 contractors: A survey. J. Constr. Eng. Manage., 115(2): 317-329.
    CrossRef    
  29. Vorster, M.C., 2007. Actions speak louder than budgets. Construct. Equip., 110(11): 59.
  30. Walker, A., 2002. Project Management in Construction. 4th Edn., Blackwell, Oxford.
  31. Yeo, K.T. and J.H. Ning, 2006. Managing uncertainty in major equipment procurement in engineering projects. Eur. J. Oper. Res., 171(1): 123-134.
    CrossRef    
  32. Zakeri, M., P.O. Olomolaiye, G.D. Holt and F.C. Harris, 1996. A survey of constraints on Iranian construction operatives' productivity. Construct. Manage. Econ., 14(5): 417-426.
    CrossRef    

Competing interests

The authors have no competing interests.

Open Access Policy

This article is distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license, and indicate if changes were made.

Copyright

The authors have no competing interests.

ISSN (Online):  2040-7467
ISSN (Print):   2040-7459
Submit Manuscript
   Information
   Sales & Services
Home   |  Contact us   |  About us   |  Privacy Policy
Copyright © 2024. MAXWELL Scientific Publication Corp., All rights reserved