Home            Contact us            FAQs
    
      Journal Home      |      Aim & Scope     |     Author(s) Information      |      Editorial Board      |      MSP Download Statistics

     Research Journal of Applied Sciences, Engineering and Technology

    Abstract
2014(Vol.7, Issue:15)
Article Information:

Case Study on 4000 m-span Cable-stayed Suspension Bridge

Haijun Wang, Jiandong Wang and Hua Wei
Corresponding Author:  Haijun Wang 
Submitted: September 22, 2012
Accepted: November 23, 2012
Published: April 19, 2014
Abstract:
This study describes the case studies for a cable-stayed suspension bridges proposed over the Tsugaru Strait, Japan. Center Bridge is designed as a compound bridge of suspension bridges and cable-stayed bridges with 4000 m super-long-span. Case studies about the effects of cable-stayed bridge length, the design of sub-cable, height and stiffness of main tower, type of foundation and length of side span on displacement were carried out. With appropriate design of above parameters, the compound bridge can reduce horizontal displacement of main tower and vertical deflection in the central portion and enhance resistance to partial loading. The study reports the results based on these case studies.

Key words:  Cable-stayed suspension bridge, case study, compound bridge, Tsugaru Strait Bridge, , ,
Abstract PDF HTML
Cite this Reference:
Haijun Wang, Jiandong Wang and Hua Wei, . Case Study on 4000 m-span Cable-stayed Suspension Bridge. Research Journal of Applied Sciences, Engineering and Technology, (15): 2998-3001.
ISSN (Online):  2040-7467
ISSN (Print):   2040-7459
Submit Manuscript
   Information
   Sales & Services
Home   |  Contact us   |  About us   |  Privacy Policy
Copyright © 2024. MAXWELL Scientific Publication Corp., All rights reserved