Project Duration Risk Transmission and Control based on CCPM
Chen Hong-Yi, Xu Liang and Zhang Chen-Song
Corresponding Author: Xu Liang
Submitted: March 08, 2013
Accepted: April 12, 2013
Published: January 20, 2014 |
Abstract:
|
This study advances a project duration risk transmission model based on CCPM and the generalized project risk element transmission theory. By combining the calculation of systemic duration risk of a single process and the transmission of duration delay through an activity chain, this study proposes an modified method of calculating and setting input buffer and project buffer and also distinguishes the bottleneck activities on both the critical chain and non-critical chain, this method can offer a more reliable basis for making a project schedule plan and duration risk control.
Key words: Bottleneck activities, critical chain project management, duration risk, risk element transmission, , ,
|
Abstract
|
PDF
|
HTML |
|
Cite this Reference:
Chen Hong-Yi, Xu Liang and Zhang Chen-Song, . Project Duration Risk Transmission and Control based on CCPM. Research Journal of Applied Sciences, Engineering and Technology, (3): 619-624.
|
|
|
|
|
ISSN (Online): 2040-7467
ISSN (Print): 2040-7459 |
|
Information |
|
|
|
Sales & Services |
|
|
|