Risk Early Warning Model of Grid Engineering Project Based on System Dynamics

Cunbin Li, Chengsong Zhang, Gongshu Lu and Si Wu
Corresponding Author:  Gongshu Lu 
Submitted: November 08, 2012
Accepted: January 01, 2013
Published: June 30, 2013
Abstract:
Timely and effective risk early warning helps managers to take relative measures in time, therefore to control risk factors as well as reduce risk occurrence probability or loss. As for the risk management of grid engineering projects in China, system dynamics method was used to establish the cost and schedule risk early warning model at first and then the construction process of one transmission line project in western China was simulated. The results indicated that the risk occurrence was effectively prevented due to the timely adjustment of construction progress after risk warning signals being sent out. Furthermore, corresponding analogue-control and result-display interface to the established model was set up, which can simulate the risk early warning values of grid engineering projects under different circumstances.

Key words:  Cost, duration, grid engineering project, risk early warning, system dynamics, ,
Abstract PDF HTML
Cite this Reference:
Cunbin Li, Chengsong Zhang, Gongshu Lu and Si Wu, . Risk Early Warning Model of Grid Engineering Project Based on System Dynamics. Research Journal of Applied Sciences, Engineering and Technology, (06): 1111-1115.
ISSN (Online):  2040-7467
ISSN (Print):   2040-7459
Submit Manuscript
   Information
   Sales & Services
Home   |  Contact us   |  About us   |  Privacy Policy
Copyright © 2024. MAXWELL Scientific Publication Corp., All rights reserved