Analysis and Evaluation of Mechanized Greenhouse Construction Project using CPM Methods

Nasim Monjezi, Mohammad Javad Sheikhdavoodi, Hadi Basirzadeh and Hassan Zakidizaji
Corresponding Author:  Nasim Monjezi 
Submitted: December 30, 2011
Accepted: January 25, 2012
Published: September 15, 2012
Abstract:
In this study, the application of project scheduling for analysis and evaluation of mechanized greenhouse construction project was studied using Critical Path Method (CPM) with WinQsb software. This study was conducted in Khuzestan province of Iran. The results showed that the minimum completion time of this project, based on using CPM method, normal time and crash time is 201 and 137 days, respectively. Normal cost and crash cost are 3102665000 and 3187740000 Rials, respectively. Also cost slope in CPM method is 1329300 Rials that it means cost of reducing one day of the project completion time is 1329300 Rials. So results of CPM method showed that the cost of reducing the project completion time, to 180 days is 1600000 Rials.

Key words:  CPM method, mechanized greenhouse construction, project scheduling, , , ,
Abstract PDF HTML
Cite this Reference:
Nasim Monjezi, Mohammad Javad Sheikhdavoodi, Hadi Basirzadeh and Hassan Zakidizaji, . Analysis and Evaluation of Mechanized Greenhouse Construction Project using CPM Methods. Research Journal of Applied Sciences, Engineering and Technology, (18): 3267-3273.
ISSN (Online):  2040-7467
ISSN (Print):   2040-7459
Submit Manuscript
   Information
   Sales & Services
Home   |  Contact us   |  About us   |  Privacy Policy
Copyright © 2024. MAXWELL Scientific Publication Corp., All rights reserved